2nd Watershed Permit Studies

Date
Title
2025-01-07 NBS Wastewater Case Studies – SF Bay – Sept 2024 Download
2025-01-03 Phase 3 NBS – Concept Designs and Cost Estimates for San Jose – Santa Clara Download
2025-01-03 Phase 3 NBS – Concept Designs and Cost Estimates for Fairfield-Suisun Sewer District Download
2025-01-03 Phase 3 NBS – Concept Designs and Cost Estimates for Delta Diablo Download
2023-06-29 Regional Evaluation of Potential Nutrient Discharge Reduction by Water Recycling Download
2023-06-29 Phase 1 – NBS Opportunities and Constraints analysis Download
2023-06-29 Phase 2 – NBS Site Specific Agency Memos Download
2022-07-06 Watershed Permit Special Studies Status Update 2022 Download
2021-07-02 Watershed Permit Special Studies Status Update 2021 Download
2020-06-04 RFI for 2nd Watershed Permit Studies Download
2019-12-04 Scoping and Evaluation Plan – Nutrient Removal by Recycled Water 11-30-19 Download
2019-12-04 Scoping and Evaluation Plan – Nutrient Removal by Nature Based Systems 11-30-19 Download