2nd Watershed Permit Studies
2025-01-07
NBS Wastewater Case Studies – SF Bay – Sept 2024
Download
2025-01-03
Phase 3 NBS – Concept Designs and Cost Estimates for San Jose – Santa Clara
Download
2025-01-03
Phase 3 NBS – Concept Designs and Cost Estimates for Fairfield-Suisun Sewer District
Download
2025-01-03
Phase 3 NBS – Concept Designs and Cost Estimates for Delta Diablo
Download
2023-06-29
Regional Evaluation of Potential Nutrient Discharge Reduction by Water Recycling
Download
2023-06-29
Phase 1 – NBS Opportunities and Constraints analysis
Download
2023-06-29
Phase 2 – NBS Site Specific Agency Memos
Download
2022-07-06
Watershed Permit Special Studies Status Update 2022
Download
2021-07-02
Watershed Permit Special Studies Status Update 2021
Download
2020-06-04
RFI for 2nd Watershed Permit Studies
Download
2019-12-04
Scoping and Evaluation Plan – Nutrient Removal by Recycled Water 11-30-19
Download
2019-12-04
Scoping and Evaluation Plan – Nutrient Removal by Nature Based Systems 11-30-19
Download
Notifications